    Server Maintenance

    Maintenance: Our facility engineer will be performing power load rebalance in C20 rack at CLE02 facility. This procedure is necessary to ensure power feed circuits are evenly loaded to  insure the circuit failover does not trip a circuit breaker and cause cascading power loss.

     

    Scope: The following servers will be shut down for approximately 10 minutes starting 11AM EST on Saturday, October 17th in order to switch the AC circuit they are connected to;  CLE02WEB04, CEL02WEB05, CLE02WEB06, CLE02WEB07, CLE02WEB08

     

    CANCELED! We could not complete this switch due to circumstances beyond our control, it will be rescheduled for a future date.

    • Post Points: 0
  • 11-05-2009 3:08 PM In reply to

    • skozyuk
    • Top 10 Contributor
    • Joined on 10-28-2007
    • Westlake, OH
    • Posts 329
    • Points 1,082

    Re: Server Maintenance

    This event has been rescheduled for Thursday, November 5th starting at 10PM EST. We anticipate maximum a 10 minute blackout for servers mentioned in previous announcement.

     
    • Post Points: 0
  • 11-05-2009 10:24 PM In reply to

    • skozyuk
    • Top 10 Contributor
    • Joined on 10-28-2007
    • Westlake, OH
    • Posts 329
    • Points 1,082

    Re: Server Maintenance

    Power will be cycled shortly, please stand by for an update.

    • Post Points: 0
  • 11-05-2009 11:05 PM In reply to

    • pwadding
    • Top 25 Contributor
    • Joined on 01-02-2009
    • Posts 8
    • Points 19

    Re: Server Maintenance

     Is this complete? I have several sites down on CLEO2WEB0.

    • Post Points: 0
  • 11-05-2009 11:16 PM In reply to

    • pwadding
    • Top 25 Contributor
    • Joined on 01-02-2009
    • Posts 8
    • Points 19

    Re: Server Maintenance

    Sorry that should have read CLEO2WEB04


    • Post Points: 0
  • 11-05-2009 11:25 PM In reply to

    • skozyuk
    • Top 10 Contributor
    • Joined on 10-28-2007
    • Westlake, OH
    • Posts 329
    • Points 1,082

    Re: Server Maintenance

    We have encountered problems while switching power circuits. Our rack APC IP power distribution unit failed to boot up, we thinking an electrical surge may have zapped it. We are brinning servers back on on a backup PDU right now.

    • Post Points: 0
  • 11-05-2009 11:34 PM In reply to

    • skozyuk
    • Top 10 Contributor
    • Joined on 10-28-2007
    • Westlake, OH
    • Posts 329
    • Points 1,082

    Re: Server Maintenance

    All servers are currently operational using direct power feed. We are installing replacement IP PDU unit right now and are going to have to switch each server off to a replacement unit in aproximately 45 minutes.

    • Post Points: 0
  • 11-05-2009 11:35 PM In reply to

    • pwadding
    • Top 25 Contributor
    • Joined on 01-02-2009
    • Posts 8
    • Points 19

    Re: Server Maintenance

     Thanks for the update.Some of the sites are back up already. Something for later I think the forum server clock is out by about 25 minute. I will submit this at 12PM eastern

    • Post Points: 0
  • 11-05-2009 11:37 PM In reply to

    • pwadding
    • Top 25 Contributor
    • Joined on 01-02-2009
    • Posts 8
    • Points 19

    Re: Server Maintenance

     I am on Mountain time. I think itis actually 2hours and 25 minutes

    • Post Points: 0
  • 11-06-2009 12:50 AM In reply to

    • skozyuk
    • Top 10 Contributor
    • Joined on 10-28-2007
    • Westlake, OH
    • Posts 329
    • Points 1,082

    Re: Server Maintenance

    We will be powering down these servers for a final circuit swap, please stanby for an update.

    • Post Points: 0
  • 11-06-2009 1:09 AM In reply to

    • skozyuk
    • Top 10 Contributor
    • Joined on 10-28-2007
    • Westlake, OH
    • Posts 329
    • Points 1,082

    Re: Server Maintenance

    The circuit switchover has been completed, no further interuptions of service are anticipated.

    • Post Points: 0